Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

CxA for Enhanced

CI-v4 EAc1:Enhanced commissioning
posted by  Tony Haschke  on 

The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?

1
Fri Jun 24, 2016, 5:06 pm

Pressure drop adjustment factor with DOAS System

CS-2009 EAc1:Optimize energy performance
posted by  Curtis Clark  on 

In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.

1
Thu Apr 9, 2015, 2:51 pm

IEQc8.1 Core and Shell credit with no tenant fit out

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shelly Christman   on 

We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.

1
Thu Mar 23, 2017, 2:17 pm

raw material invoice submital

Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Esther Kohout  on 

I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.

0

Baseline HVAC schedules

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.

1
Mon May 8, 2017, 2:23 pm

additional heating system

NC-2009 EAp2:Minimum energy performance
posted by  Alfonzo Collins  on 

I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.

1
Sun Nov 2, 2014, 11:35 pm

Master's Research Survey

NC-2009 MRc4:Recycled content
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

outdoor air flow monitoring location

CS-2009 IEQc1:Outdoor air delivery monitoring
posted by  Lily Li  on 

FOR DOAS unit, can the outdoor air flow monitoring located in supply air side?

1
Mon Jan 23, 2017, 3:11 pm

Kitchen Hoods with gas make-up air unit

NC-2009 EAc1:Optimize energy performance
posted by  James Sullivan Jr.  on 

I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?

1
Mon Jul 6, 2015, 3:43 pm

Use of Hycrete waterproofing admixture for Innovation credit

NC-2009 IDc1:Innovation in design
posted by  Donna Juselis  on 

Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.

1
Fri Dec 16, 2016, 7:14 pm