Forum quick links
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
Pressure drop adjustment factor with DOAS System
CS-2009 EAc1:Optimize energy performanceposted by Curtis Clark on
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and views - daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.
Baseline HVAC schedules
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.
additional heating system
NC-2009 EAp2:Minimum energy performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Master's Research Survey
NC-2009 MRc4:Recycled contentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
outdoor air flow monitoring location
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Lily Li on
FOR DOAS unit, can the outdoor air flow monitoring located in supply air side?
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize energy performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.