Forum quick links
Air economizers in proposed and baseline
NC-2009 EAp2:Minimum energy performanceposted by Jeff Riggs on
If air economizers are not required to be modeled in the baseline system due to climate zone (4a) can you model the proposed with economizers if in design and not model economizers in the baseline?
Alternative Compliance Path
Schools-2009 SSp2:Environmental site assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
Well Building Standard
CI-2009 IDc1:Innovation in designposted by Susan Coy on
I am working on a LEED-CI project and we are doing documenting the project to receive the Well Building Standard certification as well.
VVT System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Brian Kenney on
Hello, We have a design completed in California with constant volume packaged rooftops controlled as a VVT system. The owner is contemplating getting LEED certification.
What does LEED consider as Sitework?
NC-2009 SSp1:Construction activity pollution preventionposted by Erika Duran on
Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.
Additional Points for Water Reuse
NC-v4 WEc2:Indoor water use reductionposted by Soo Choi on
I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.
Project on Hold
posted by Nereyda Rodriguez on
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.
Using microgrid battery storage to achieve demand response credi
Pilot-Credits EApc8:Demand responseposted by S. Sachs on
I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).
No mention of Private offices
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.