Forum quick links
Hardscape covered by building.
NC-2009 SSc7.1:Heat island effect - nonroofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).
Low Mercury Credit - Cafeteria Kitchen Equipment
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Sara Zoumbaris on
Hello, Although I am pursuing this credit as ID for LEED-CI, I am posting this question here.
Is Cradle-to-Cradle Certification acceptable?
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Chris Moore on
I have a styrofoam insulation that has zero VOC out put. The supplier claims it undergoes VOC small scale chamber testing by MBDC and the product is cradle-to-cradle certified.
ID Credit for CSv 2009 Project
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by José Solis on
Is it possible to use this credit as an ID credit for a CS v2009 project? Could we achieve it if we write the requirements into the tenant lease language or the binding tenant requirements?
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
Complex projects benefit from turn-key waste mgmt services
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Joanna Switzer on
The recently completed Dr.
LEED Ergonomic Credit
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Katie Cervenec on
Does anyone have any tips for getting the building occupants excited about participating in the ergonomic credit and learning about their new ergonomic features in their building?
SCS not yet approved?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
SCS certified EPDs are not yet approved?
Envisioning this credit for condo building in Harlem
EBOM-v4 LTc1:Alternative transportationposted by Charlotte Matthews on
Residents and condo owners rarely respond to surveys.
EBOM SSc2: policy vs practice for snow removal
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Drew DePalma on
Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.