Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Enhanced Refrigerant Management - Purchased Cooling Loop

NC-2009 EAc4:Enhanced refrigerant management
posted by  Vinny Greco  on 

If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?

1
Thu Feb 11, 2016, 7:32 am

Above ground-floor horizontal exterior spaces (plaza, roof)

NC-v4 SSc6:Light pollution reduction
posted by  Jill Perry, PE  on 

Forgive me if this was covered elsewhere but I couldn't find it.

1
Thu Jun 8, 2017, 2:40 pm

Final Cleaning

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Benjamin McGrath  on 

For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.

1
Sat Aug 26, 2017, 8:50 pm

WEp1 - PIf3 link - new LEED on line

NC-2009 WEp1:Water use reduction
posted by  Todd Bundren  on 

My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).

1
Tue Feb 24, 2015, 3:59 pm

Exemplary Performance - Unobstructed View

NC-2009 IEQc8.2:Daylight and views - views
posted by  Erin Holdenried  on 

I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks

0

existing site soils are impervious

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  emily reese moody  on 

Hello, I am fielding a question for our civil engineer.

1
Wed Jul 29, 2015, 8:18 pm

Baseline system for water loop heat pump in Proposed case

NC-2009 EAp2:Minimum energy performance
posted by  Mayank Bhatnagar  on 

Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.

1
Wed Jan 4, 2017, 2:57 pm

Refrigerants outside of the building, but still on site

EBOM-2009 EAp3:Fundamental refrigerant management
posted by  Levi Jimenez  on 

We have a property with a commercial ice machine, which uses more than 0.5 Lb CFC 502 refrigerant.

1
Fri Nov 21, 2014, 5:23 pm

Recycling Areas for Multifamily/commercial project

NC-2009 MRp1:Storage and collection of recyclables
posted by  Rob Hink  on 

I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.

0
1
Tue Jun 6, 2017, 7:55 pm