NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
Occupancy Count for Residential
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Iris Amdur on
We have a mixed-use (residential, retail, office) project that wants to implement a vehicle sharing program for this credit.
green cleaning term
NC-2009 IDc1:Innovation in designposted by Alfonzo Collins on
I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease, or agree to control the cleaning for both
Accounting for Shower Use by non-building occupants
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Deborah Lucking on
We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.
Phases of construction
Schools-2009 MPR2:Must be a complete, permanent building or spaceposted by Cindy Quinn on
I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.
Substantial Renovation - Envelope Modeling
Schools-NC-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Hi, I am modeling an existing school building which is undergoing substantial renovation. As a part of the renovations, new windows are being added and the grade level is being changed.
Parking spaces
Retail-NC-v2009 SSc4:Alternative transportationposted by Megan Bove on
Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?
recessed walk off mat
EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source controlposted by Bomin Kim on
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.
Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
when looking at a site to obtain information about natural conditions with an existing school being torn down and a new school being built-how would you access or would it even make sense to evalua