Campus Project

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  P Fanfulik  on 

I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?

1
Thu Feb 25, 2016, 7:23 pm

LEED Pilot Credit 30

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  S. Sachs  on 

We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi

1
Tue Jun 28, 2016, 8:14 pm

Occupancy Count for Residential

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Iris Amdur  on 

We have a mixed-use (residential, retail, office) project that wants to implement a vehicle sharing program for this credit.

0

green cleaning term

NC-2009 IDc1:Innovation in design
posted by  Alfonzo Collins  on 

I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease, or agree to control the cleaning for both

1
Wed Jul 1, 2015, 5:55 pm

Accounting for Shower Use by non-building occupants

EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiency
posted by  Deborah Lucking  on 

We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Tue Dec 1, 2015, 4:18 pm

Phases of construction

Schools-2009 MPR2:Must be a complete, permanent building or space
posted by  Cindy Quinn  on 

I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.

0

Substantial Renovation - Envelope Modeling

Schools-NC-v4 EAc2:Optimize energy performance
posted by  Kalyan Nishtala  on 

Hi, I am modeling an existing school building which is undergoing substantial renovation. As a part of the renovations, new windows are being added and the grade level is being changed.

1
Tue May 16, 2017, 3:03 pm

Parking spaces

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Megan Bove  on 

Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?

1
Sat Aug 26, 2017, 11:51 pm

recessed walk off mat

EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source control
posted by  Bomin Kim  on 

We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.

1
Thu Apr 14, 2016, 11:29 pm

Rainwater Management question

Schools-NC-v4 SSc4:Rainwater management
posted by  Karen Darley  on 

when looking at a site to obtain information about natural conditions with an existing school being torn down and a new school being built-how would you access or would it even make sense to evalua

0