Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Temporary potable connection to a permanent irrigation system

Schools-2009 WEc1:Water efficient landscaping
posted by  Bradley Smith  on 

I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.

1
Sun Aug 27, 2017, 12:48 am

Building Envelope Commissioning

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Lance Barron  on 

We are working with a client who would like to get LEED credit for building envelope commissioning, but which has not pursued enhanced commissioning.

1
Sat Aug 26, 2017, 11:45 pm
1
Fri Jan 9, 2015, 9:52 pm

Heat pump water heater

CS-v4 EAc6:Enhanced refrigerant management
posted by  Ammon Palmer  on 

We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.

1
Thu Jun 2, 2016, 10:43 pm

Using pre-existing conditions as oppposed to existing conditions

CS-2009 SSc6.1:Stormwater design - quantity control
posted by  Mei Zhu  on 

SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50

1
Wed Jul 27, 2016, 7:36 pm

asphalt impregnated felt underlayment for under wood floor

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Debra A. Lombard  on 

off-gassing of asphalt impregnated felt underlayment for under wood floor. Does anyone have any documented info indicating problems with off-gassing of asphalt impregnated felt underlayment for un

1
Wed Jan 18, 2017, 5:07 am

Low Flow Sink

CI-2009 WEp1:Water use reduction
posted by  Ray Jones  on 

All, Is a break room sink in an office space considered a kitchen sink with a 2.2 gal/min baseline or a commercial lav with a .5 gal/min baseline?

1
Mon Sep 7, 2015, 1:12 am

Advantages of v4 Schools over NC

LEED Rating System Selection
posted by  GBD Architects  on 

Hi all, We are analyzing a project that is on a higher ed campus but serves pre-K students.

1
Fri Feb 3, 2017, 6:43 pm

Updating previously awarded credits to match new adjustments

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Bryan Finnegan  on 

We are currently adjusting a few credit submissions based on Prelim. Construction review feedback and one credit will change material costs from $35k to $100k.

1
Wed Dec 30, 2015, 8:26 pm

Dynamic Glazing for IDC ?

NC-v4 INc1:Innovation
posted by  Sriranjani Ramachandran  on 

Can anyone claim points under the Innovation in Design Credit-Path 1 for using dynamic Glazing in the project?

1
Wed May 17, 2017, 3:57 pm