posted by  Barry Giles  on 

Since completing this version 4 Platinum we have been successful on a second V4 Platinum at One Sansome Street, San Francisco for the Barker Pacific Group.

1
Sat Nov 28, 2015, 2:51 am

SSc5.1 or SSc5.2

NC-2009 SSc5.2:Site development - maximize open space
posted by  Sheryl Swartzle  on 

My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.

1
Wed Apr 6, 2016, 6:57 pm

Master's Research Survey

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.

0

LEED project with associated Parking Deck

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ashley Love  on 

I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!

1
Tue Jan 17, 2017, 6:12 pm

School Facilities

CI-2009 SSc2:Development density and community connectivity
posted by  Neil Rosen  on 

Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?

1
Wed Dec 30, 2015, 5:29 pm

Showerhead with multiple settings

EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiency
posted by  AtSite Inc  on 

To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.

1
Wed Dec 21, 2016, 11:49 pm

Option 1 - Reduction Combination?

NC-2009 WEc1:Water efficient landscaping
posted by  Cynthia Estrada  on 

We are looking at this credit for our project and after reading a few posts and reviewing the WEc1 form in LEED online my question is; the NC 2009 reference guide states that "Reductions must be at

1
Fri Nov 27, 2015, 7:31 pm

Glass skylights and existing roof

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Hickerson  on 

I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.

1
Tue Aug 30, 2016, 7:32 pm

Are basement walls included in envelope calculations

NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roof
posted by  Stacey Olson  on 

I understand the floor slab of basements is allowed to be included; what about the envelope?

1
Wed Jan 18, 2017, 12:00 am

data center equipment not listed in DOE Energy Star categories

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Gail Napell  on 

Servers are listed on the Energy Star website, but not receivers. Is it safe to assume they are still not Energy Star eligible?

1