Multiple indentical RTUs combined with plenum ducts

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Chanyang Shin  on 

Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?

1
Thu Aug 18, 2016, 8:13 pm

Hot Water and Chilled Water Primary- Secondary Pumping

NC-2009 EAp2:Minimum energy performance
posted by  ESD Engineer  on 

My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.

1
Mon Jul 17, 2017, 6:07 pm

Number of signs required to be considered "comprehensive"

NC-2009 IDc1:Innovation in design
posted by  Kristin Walsh  on 

I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.

1
Wed Jan 13, 2016, 9:01 pm

Pre-Rinse Spray Valves in Laboratories

NC-2009 WEp1:Water use reduction
posted by  Wyatt Suddarth  on 

I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa

1
Wed May 18, 2016, 2:45 am

Site Management Policy

Credit Forums
posted by  Kelsey Jensen  on 

When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?

0

Meter for Water Use in Laundry

Healthcare-v2009 WEc2:Water use reduction - measurement and verification
posted by  Jon Penndorf  on 

Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks

0

Does gravel count?

NC-v4 SSc3:Open space
posted by  Harvard University Green Building Services  on 

Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?

1
Tue Jan 17, 2017, 7:43 pm

How to use combination of Option 1 and Option 2?

NC-2009 MRc5:Regional materials
posted by  Erica Downs  on 

In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?

1
Fri Apr 7, 2017, 3:26 pm

DES Option 1 - Baseline System

NC-v4 EAp2:Minimum energy performance
posted by  Jay patel  on 

I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .

1
Tue Aug 1, 2017, 2:56 pm

Monitoring Period

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Mari Hamasaki  on 

What is the required monitoring period for this credit?

0