Forum quick links
VVT System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Brian Kenney on
Hello, We have a design completed in California with constant volume packaged rooftops controlled as a VVT system. The owner is contemplating getting LEED certification.
What does LEED consider as Sitework?
NC-2009 SSp1:Construction activity pollution preventionposted by Erika Duran on
Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.
Additional Points for Water Reuse
NC-v4 WEc2:Indoor water use reductionposted by Soo Choi on
I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.
Project on Hold
posted by Nereyda Rodriguez on
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.
Using microgrid battery storage to achieve demand response credi
Pilot-Credits EApc8:Demand responseposted by S. Sachs on
I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).
No mention of Private offices
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
Looks like I’m first to post here so here goes!
Pilot-Credits EQpc85:Learning Controls for Thermal Comfortposted by Dirk Kestner on
1. Has anyone else pursued this Pilot? If so what was your experience? 2.
Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and views - daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
non-irrigation credit
NC-v4 WEc2:Indoor water use reductionposted by henry nguyen on
Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre
FTE and LEED boundary - LEED CI (v4)
posted by Anna de Anguera on
For LEED CI - this may be so obvious and that is why it is not actually stated anywhere - but I'm assuming that FTE's are calculated based on your LEED boundary, and excludes the rest of the buildi