Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
Hot Water and Chilled Water Primary- Secondary Pumping
NC-2009 EAp2:Minimum energy performanceposted by ESD Engineer on
My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Pre-Rinse Spray Valves in Laboratories
NC-2009 WEp1:Water use reductionposted by Wyatt Suddarth on
I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa
Site Management Policy
posted by Kelsey Jensen on
When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
How to use combination of Option 1 and Option 2?
NC-2009 MRc5:Regional materialsposted by Erica Downs on
In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?