Forum quick links
Requirement 7 - Windows in the Stairs
Pilot-Credits EQpc78:Design for active occupantsposted by Douglas Flandro on
Do the windows in the stairways need to be 8 square feet at each level? I have a 3 story stairwell with a narrow window that runs the length of the stairs. It is 19 feet by 1 foot.
Future Fit-Out Space & Transients - Table Plf3-3 or Table Pfl3-4
Healthcare-v2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
My project is an addition with on future being future fit-out space.
Golf Course Clubhouse Certification
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Existing road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Heather Holdridge on
The development (landscape and new chiller yard) associated with our LEED project reaches across a road that is owned by the city and not the client.
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum energy performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
Ventless Dryers
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mark Gardner on
We are working on a project considering the use of ventless dryers. Has anyone ever used ventless dryers and had a problem complying with IEQc5? Thanks!
ASHRAE AEDG Retail - Prescriptive skylight requirement
CS-2009 EAp2:Minimum energy performanceposted by Alexis Voeltner on
We are working on a small retail store 18,000 sqft and we are considering pursuing the prescriptive compliance path AEDG (option 2) to meet EAp2.
Shared HVAC system with non-LEED building
NC-v4 EAc2:Optimize energy performanceposted by GBD Architects on
Hi all, We are looking to certify a new building on a higher-ed campus that will be sharing HVAC systems with an existing building. The existing building will likely not pursue certifications.
Certified Wood & Hardware
CS-2009 MRc6:Certified woodposted by Bryan Finnegan on
Our invoices do not break out any hardware used with the millwork as a separate line item. Is it required to exclude these values for Certified Wood?
Herbicides and Pesticides used during performance period
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Joseph Snider on
I am a bit confused about the use of herbicides and fertilizers for landscaped areas within the LEED boundary.