Forum quick links
Making the Shipping Company Take the Packaging?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Kimberlee Dobbins on
I know I read about a company doing this, but I can not seem to find who it was, or how it was done.
Resinous Flooring
CI-v4 EQc2:Low-emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
Pressure drop adjustment factor with DOAS System
CS-2009 EAc1:Optimize energy performanceposted by Curtis Clark on
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and views - daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.
Baseline HVAC schedules
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.
additional heating system
NC-2009 EAp2:Minimum energy performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Master's Research Survey
NC-2009 MRc4:Recycled contentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
outdoor air flow monitoring location
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Lily Li on
FOR DOAS unit, can the outdoor air flow monitoring located in supply air side?