Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Sharing my BD+C exam tips!

General forums
posted by  Paula Melton  on 

Hi, all! I wrote up my LEED AP BD+C exam tips in so much detail that we went crazy and decided to turn it into a study guide, workbook, and online practice exam!

0

LEED for Neighborhood Development + Walkable Project Site

Pilot-Credits PC14:Walkable Streets
posted by  Nikki Wildman  on 

We just wanted to share a little of our experience with this credit.

0

Existing parking lot, new LEED space

CI-2009 SSc3.3:Alternative transportation - parking availability
posted by  Susan Reid  on 

Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.

1
Wed Jan 18, 2017, 4:10 pm

Move-in versus construction

LEED Rating System Selection
posted by  Mark Donahue  on 

Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?

1
Wed Aug 26, 2015, 9:35 pm

WELL Certification Estimation Calculation

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

Our team is trying to estimate about where our project is in achieving WELL certification (and at what level) prior to registration.

1
Fri Feb 17, 2017, 5:06 am

Concrete Regional and Recyle Content

NC-2009 MRc5:Regional materials
posted by  Rick Alfandre  on 

I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th

1
Thu Jun 15, 2017, 3:24 pm

NC-v4: Rainwater management

NC-v4 SSc4:Rainwater management
posted by  Hadar Farjo  on 

Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des

1
Fri Jul 14, 2017, 2:40 pm

Automatic Receptacle Control for Renovation projects

CI-v4 EAp2:Minimum energy performance
posted by  Jeni Panars  on 

ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.

1
Thu Jun 29, 2017, 12:24 am

Narrative explaining compliance of ESC plan with NPDES guideline

NC-2009 SSp1:Construction activity pollution prevention
posted by  Madhura Dhayagude  on 

Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.

1
Sat Jul 30, 2016, 8:28 pm

Energy Recovery Bypass

NC-2009 EAp2:Minimum energy performance
posted by  Kalyan Nishtala  on 

Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.

0