Curtain Wall Should Be Exterior Wall or Glazing?
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Sara Zoumbaris on
Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!
Credit Union
CI-2009 SSc2:Development density and community connectivityposted by Neil Rosen on
Would a credit union work as a basic service in place of a bank?
Commingled waste
NC-2009 MRc2:Construction waste managementposted by Sundararaj Subburaman on
I have NC Retail 2007 project. The same type of waste is grouped together. For example, the metal includes iron, aluminium and etc, But sorting is done off site.
Commissioning Starting After 50% CDs
NC-2009 EAc3:Enhanced commissioningposted by Sara Zoumbaris on
I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
Peak Transients
Schools-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
NPDc11: are townhomes single dwelling or multiunit buildings
ND-v2009 NPDc11:Visitability and universal designposted by Megan Shelby on
For NPDc11 Visitability and Universal Design, are townhomes considered single dwelling unit buildings or multiunit buildings?
Core Performance Guide
NC-2009 EAp2:Minimum energy performanceposted by Tricia Loe on
I have a project that is considering using the Core Performance Guide option for compliance with this credit.
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum energy performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even
Is it OK to use different units of measurement for MRc6 + MRc7?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Craig Wilson on
A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).