WEc1 - Lav Efficiency Floor?
CI-2009 WEc1:Water use reductionposted by Jeremy Knoll on
Is there a lower limit to the lav flow rate below 0.5gpm that USGBC will accept? I saw something posted on the EPA's website awhile back, but am not finding it now.
C2C Bronze in LEED v3?
CI-2009 IDc1:Innovation in designposted by Brian Salazar on
Hi all - I am aware of the calculations for C2C products for ID credits in LEED v3 (Silver, Gold, Platinum).
Reopening one path of LEED-CI SSc1.2 in Construction Review
posted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
LEVs and Electric Charging Stations to share a spot
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Marisa Britton on
We are doing a combined approach, with both LEVs and charging stations. Since there are not location requirements on the charging station, can it be located at an LEV parking space?
Coco, Coir, or other fiber mats
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Erica Downs on
Anyone have experience with how to treat coco fiber mats?
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Pool Deck
NC-v4 SSc3:Open spaceposted by Joseph Snider on
We understand that a swimming pool itself does not contribute,and we have been told we can exclude the pool from the calculations. Can we include the pool deck area itself?
WEc3 denial
NC-2009 WEc3:Water use reductionposted by Therese Thompson on
We received our final review on Friday, and do not understand why Credit WEc3 was denied.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater design - quality controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.