WEc1 - Lav Efficiency Floor?

CI-2009 WEc1:Water use reduction
posted by  Jeremy Knoll  on 

Is there a lower limit to the lav flow rate below 0.5gpm that USGBC will accept? I saw something posted on the EPA's website awhile back, but am not finding it now.

1
Mon Jan 30, 2017, 6:53 pm

C2C Bronze in LEED v3?

CI-2009 IDc1:Innovation in design
posted by  Brian Salazar  on 

Hi all - I am aware of the calculations for C2C products for ID credits in LEED v3 (Silver, Gold, Platinum).

1
Wed Jan 18, 2017, 6:01 am

Reopening one path of LEED-CI SSc1.2 in Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Apr 28, 2015, 2:28 pm

LEVs and Electric Charging Stations to share a spot

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Marisa Britton  on 

We are doing a combined approach, with both LEVs and charging stations. Since there are not location requirements on the charging station, can it be located at an LEV parking space?

1
Fri Nov 27, 2015, 4:51 am

Coco, Coir, or other fiber mats

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Erica Downs  on 

Anyone have experience with how to treat coco fiber mats?

1
Fri Nov 27, 2015, 8:30 pm

Energy and Atmosphere credit #5

NC-2009 EAc5:Measurement and verification
posted by  James Goldfield  on 

I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.

1
Fri Feb 10, 2017, 7:06 pm

Pool Deck

NC-v4 SSc3:Open space
posted by  Joseph Snider  on 

We understand that a swimming pool itself does not contribute,and we have been told we can exclude the pool from the calculations. Can we include the pool deck area itself?

1
Sat Aug 26, 2017, 1:03 pm

WEc3 denial

NC-2009 WEc3:Water use reduction
posted by  Therese Thompson  on 

We received our final review on Friday, and do not understand why Credit WEc3 was denied.

0

Enhance Cx, 10 month review of building operation

NC-2009 EAc3:Enhanced commissioning
posted by  Laura Howe  on 

Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?

1
Fri Apr 1, 2016, 1:36 am

Roof Terrace Storm Drains

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Jeannie Rueter  on 

I'm working on a major remodel project next to the ocean.

1
Fri Jul 14, 2017, 2:30 pm