Local Food Production
Pilot-Credits SSpc82:Local food productionposted by OSLEIDE WALKER on
Does anyone have any experience developing a successful Integrated Pest Management (IPM) Plan for this pilot credit. Do you know exactly what measures or components are required?
ECp2 and c1 - Location of this Addendum?
posted by Michelle Bracewell-Musson on
Hello Tristan, My team has had a bit of a challenge trying to find "like" manufacturing buildings that are conditioned.
Slab on grade and concrete piers
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Tom Martin on
Has the pressure differential requirement of at least 5 pascals for LEED v2009 IEQc5 Indoor and Chemical Source Pollutant Control been eliminated from the requirement of this credit?
Appeal after second review
posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum energy performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Any HAP Expert?
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum energy performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur