Pursuing credits in recert that were denied during intial cert

Performance Period
posted by  Alexa Stone  on 

Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.

1
Mon Aug 28, 2017, 6:00 pm

Budget Method

NC-v4 EQc2:Low-emitting materials
posted by  LUCY WILLIAMS  on 

We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.

1
Mon Aug 21, 2017, 1:25 pm

short term bicycle storage

NC-v4 LTc6:Bicycle facilities
posted by  sue bryant  on 

Can this be located inside a building as long as it is within 100' of the main entrance?

1
Wed Jul 22, 2015, 2:08 am

2009 BD+C and 2009 CS on Campus site- SSc4.2

LEED Guidance for Campuses and Multiple Buildings
posted by  Deborah Lucking  on 

SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.

1
Sat Jan 16, 2016, 2:20 am

Download Forms

NC-2009 PIf1:Minimum Program Requirements
posted by  Ralph Bicknese  on 

Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef

1
Sat Jan 16, 2016, 3:23 am

Proximity to rail station

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Sheryl Swartzle  on 

Our one and only bus, which stops right outside our project entrance, is a 10 minute drive in heavy traffic (meaning many rides would be less than 10 minutes) but 3.5 miles to a Metro Rail station.

1
Thu Jan 12, 2017, 9:44 pm

Tint to Reduce Glare

NC-2009 IEQc8.2:Daylight and views - views
posted by  Sara Zoumbaris  on 

We have a project that, after occupancy has taken place, would like to install a tinted film on some of the southern facing windows to reduce glare in work spaces.

1
Tue Nov 17, 2015, 3:07 pm

Site lighting calculations

CS-2009 EAp2:Minimum energy performance
posted by  charles bell  on 

We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities.

1
Tue Sep 30, 2014, 7:51 pm

Who can be the CxA?

CI-v4 EAc1:Enhanced commissioning
posted by  emily reese moody  on 

Under v3, if a project wanted to pursue the enhanced Cx credit, a third-party CxA was required, and that entity completed the activities for both the prerequisite and the enhanced credit. Have the

1
Sat Mar 19, 2016, 12:06 am

Pilot Credit 101

Pilot-Credits EQpc78:Design for active occupants
posted by  Kiyomi Kurooka  on 

This was the first time our office participated in a Pilot Credit.

0