School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Achieving Same Pilot Credit Twice?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?
Total Site Areas
CS-2009 SSc5.2:Site development - maximize open spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.
Condenser water
CS-v4 EAc3:Advanced energy meteringposted by MKK LEED on
Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.
Onsite Recreation Space
Pilot-Credits EQpc78:Design for active occupantsposted by Megan Recher on
We are working on a new high school and I want to clarify the onsite recreation space.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
Protect Habitat on Campus
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and views - daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
non-irrigation credit
NC-v4 WEc2:Indoor water use reductionposted by henry nguyen on
Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre