Forum quick links
Enhanced Cx - EAc3;
NC-2009 EAc3:Enhanced commissioningposted by Miles Britz on
Systems Manual; on our Const. Phase submittal the reviewer stated we need to include a Systems Manual. It appears this refers to the Training of staff on the bldg.'s.
Brownfield Documentation
NC-2009 SSc3:Brownfield redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.
ADA Parking Exclusion
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Daniel Joseph on
Can we exclude ADA parking from the total parking capacity when considering the preferred parking 5% max?
PV - how is it accounted for?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by sue bryant on
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.
Education & Outreach ID credit for v4?
Hospitality-NC-v4 INc1:Innovationposted by Karen Heet on
Howdy! Does v4 accept the ID credit Education & Outreach as the 2009 version did? Many thanks!
Natural Ventilation of a Warehouse/Maintenance Building
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Phil Stafa on
Has anyone had an issue with complying with ASHRAE 62.1 for natural ventilation of a space that is being used as a maintenance garage? We have 3 garage doors that are open to a large garage type a
Prescriptive Method of Documenting - Floor Area (per bay)
NC-2009 IEQc8.1:Daylight and views - daylightposted by Michael Haugh on
First off, I have had a very hard time finding information to help complete this Credit's documentation.
Master site credits
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Refurbishing of historic windows
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Kath Williams on
Windows in our historic building project have been removed, refurbished, glass upgraded to double-pane, low-e, etc. Can we use frames under MR c1 Building Reuse and MR c5 Regional Materials?
LEED EQ 4.2 Wallpaper Compliance
posted by Saahiti Penigalapati on
One of the credits we are attempting on a LEED project is the EQ 4.2 (Low Emitting Materials-Paints and coatings).