Forum quick links
Energy Effiicency Measures
CI-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Under option one for compliance (energy simulation), which measures can credit be taken for?
Option 1 - What to include in Site Area calc
CS-2009 SSc2:Development density and community connectivityposted by Jay Murray on
I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
Steam Kettles for Process Water Use
Retail-CI-v2009 WEp1:Water use reductionposted by David Hryvniak on
I'm working on a project that is installing steam kettles for commercial food service. The equipment consists of two 6-gallon kettles mounted on a modular base.
MPR 6 & USGBC Energy and Water Data Release form
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Katie Peterschmidt on
Could we get a confirmation on whether the utility release form is still applicable?
Dining facility overall area with or without walk-in coolers
NC-2009 EAp2:Minimum energy performanceposted by Addisu Lemlem on
To generate baseline for HVAC systems, the building total SF is 28000 including walk-in coolers and an outside mechanical room. My question is, Can I model the walk-in cooler separate?
Future Expansion
NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
We have a building under construction now for which we will pursue LEED certification.
Exterior doors in meeting rooms
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Jeannie Rueter on
The conference center I'm working on has several small meeting rooms that have interior and exterior doors with the exterior doors leading to open public terraces.
Varying Transit Schedules
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Risto Beatty on
I am working on a project located on a college campus where various university bus lines provide 350 rides per day while school is in session.
OA Air Flow Monitoring in Laundry
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Joe Kaminski on
The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.