Summary marked "N"
NC-2009 PIf3:Occupant and Usage Dataposted by Ryan Kurlbaum on
We have completed this form and for some reason continue to have the "summary" box marked as "N".
Used Furniture with Recycled Content
CI-2009 MRc4:Recycled contentposted by Kristine Byers on
Our project is a TI which includes the renovation of several floors of a corporate office building. The tenant is bringing with them a substantial amount of used furniture.
Mop sink in v4
NC-2009 WEp1:Water use reductionposted by Lissa Spitz on
Hi, our project is a data center that shares toilets in an adjacent building. The only plumbing fixtures in the DC are a mop sink and eyewash units. Can we achieve the WE indoor prereq?
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Energy Star minimum area = 5,000sf
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Saul Pichardo, AIA on
I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.
residential kitchen - spray nozzle
NC-2009 WEc3:Water use reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?
Concrete Formwork
CS-2009 MRc5:Regional materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Reduce quantity of elevators
Pilot-Credits EQpc78:Design for active occupantsposted by Brenda Parker on
Has anyone done a study to prove that incorporating the features of this credit into their buildings has reduced elevator usage in a high-enough percentage to be able to reduce the quantity of elev
How to Apply Research Park Guidelines when Zoning is silent
CS-2009 SSc5.2:Site development - maximize open spaceposted by Maggie Hogan Skaug on
A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.
Detention Center Perimeter and Recreation Yard Security Lighting
NC-2009 SSc8:Light pollution reductionposted by Dranan Sparks on
I have a state owned youth detention center (jail) project in lighting zone LZ1.