Forum quick links
EPD Credits - Exemplary Performance
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Chris Brown on
All three of the EPD credits have two options each that can be pursued individually for one point or together for a total of two points for each EPD credit.
Exemplary Performance for No Parking
NC-v4 LTc7:Reduced parking footprintposted by Risto Beatty on
If a project has no parking whatsoever, new or existing, can it claim exemplary performance for a 100% reduction?
Non-LEED-Certifiable Building on Site
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Using the calculator tab for MRc5 credit
NC-2009 MRc5:Regional materialsposted by Kavita K on
This is my first time handling LEED documentation for MR credits and I am confused as to how to use the calculator tab for MRc5.
Credit Make-up Air Unit
NC-2009 EAp2:Minimum energy performanceposted by John on
Can we claim the credit for Make-up air unit? or do we need to model it in Baseline same as proposed? How to show this system in Section 1.4?
District Energy Systems
NC-v4 EAp2:Minimum energy performanceposted by Bob Crowell on
Marcus or anyone who knows the answer, I have a squash facility that is being added on to an existing building. The LEED Boundary does not include the plant. 1) The existing plant serves only one
2004 Energy Star score applicable?
EBOM-v4 EAp2:Minimum energy performanceposted by Yulia Chen on
Hi all, We intend to apply for a LEED EBOM cert for a multi-tenant building built in the 1910s. The building was renovated and earned its Energy Star Score back in 2004.
Industrial Maintenance and Dry Fog
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Celimar Fournier on
What is the VOC Limit for Industrial Maintenance and Dry Fog?
WELL Continuing Education
posted by Pippa Lee on
Hi all, I had a question regarding WELL CE credits, and more specifically the 6 WELL specific units you must achieve for ongoing AP certification.
Feature 01 Air Quality Standards - how to ensure you'll meet it
posted by Katie Lowery on
Hi, I'm in the beginning stages of administrating my first WELL project. I'm trying to get my head wrapped around how to ensure that the preconditions are met through design specifications.