Adding more projects to a Campus

LEED Guidance for Campuses and Multiple Buildings
posted by  Deborah Lucking  on 

We have a campus project that has completed Final Design Review. The owner is looking at adding more buildings to the campus, at some point in the future. 1.

4
Thu Mar 2, 2017, 8:26 pm

Handwatering in lieu of temporary irrigation

NC-2009 WEc1:Water efficient landscaping
posted by  Mickela Pallares  on 

Has anyone had any experience in submitting handwatering by the landscape maintenance crew for establishment, instead of temporary above ground irrigaiton?

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Thu Mar 2, 2017, 3:13 pm

Previously developed

ND-v4 SLLc1:Preferred locations
posted by  Sarah Kearney  on 

Hello, We are developing 50-acre of mixed-use development. Currently mainly all the land is parking lots and has been so for over 20 years.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Mar 1, 2017, 11:04 pm

Transfer Grills

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Alfonzo Collins  on 

We are hoping to directly duct fresh air into a small utility room adjacent to an open room.

5
Wed Mar 1, 2017, 9:32 pm

Inverted Marking Paint

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Lawrence Lile  on 

I've got a contractor who is just wild about Inverted Marking Paint - orange spray paint that can spray upside down. This stuff is in no way LEED compliant.

4
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Wed Mar 1, 2017, 5:05 pm

District Energy Cx Guidance

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Candice Rogers  on 

Hello, We have a project that meets the requirements of District Energy Systems. There is one new piece of equipment and multiple existing that will serve the facility.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Feb 22, 2017, 6:08 pm

MR 2.2 Form Change

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Fred Smith  on 

I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability.

4
Wed Feb 22, 2017, 5:10 pm

Documented floor plans with occupancy scale

CI-2009 EAc1.2:Optimize energy performance - lighting controls
posted by  Edgar Arevalo  on 

Before I began uploading the floor plans showing the controls and lighting equipment on the LEED online template for EAc1.2, I noticed that the templates requests floor plans indicated which zones

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Feb 22, 2017, 4:07 pm

CSRs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Helene Lefkowitz  on 

Are CSRs required simply for manufacturer's (a blanket report that encompasses all products made by a particular manufacturer), or are CSRs required for each individual product?

3
Default Avatar
Director
ANCL
LEEDuser Basic Member
0 thumbs up
Tue Feb 21, 2017, 7:12 pm

Data Center CxA

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Dishno  on 

The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha

4
Default Avatar
Commissioning Engineer
LEEDuser Basic Member
15 thumbs up
Sun Feb 19, 2017, 10:24 pm