Forum quick links
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Sara Greenwood on
Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.
Mechanical Ventilation for Multifamily Highrise Bedrooms
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Neil Sen on
I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.
Health and Safety Specialist
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
The credit requirements state that the team should "Engage an Ergonomist or Health and Safety Specialist". What is a Health and Safety Specialist? Is this someone with Ergonomics training?
VOC limits?
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Where is the VOC limit table for wet-applied products? I can't find any tables or mention of the referenced standards for VOC limits in the Reference Guide . . .
Modeling district purchased heat as hot water instead of steam
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria. The campus central plant boiler will provide steam to the cafeteria through a utility tunnel at basement level.
shower in adjacent existing building
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Lyle Axelarris on
Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit?
Financial support option
EBOM-v4 SSc1:Site development - protect or restore habitatposted by Tracy Smith on
Hi, Just want to make sure I'm understanding this point correctly.
Existing building demolition
Healthcare-v2009 MRc2:Construction waste managementposted by Micah Vainikka on
I work for a construction company that is building a new hospital for a client.
CxA Allowed to be Hired by GC?
CI-2009 EAc2:Enhanced commissioningposted by LUCY WILLIAMS on
Hi, Does the GBCI accept the Cx Agent for the Enhanced Commissioning credit to now be hired by the Contractor in a design-build scenario? In reading Interpretation #10244, it seems this is now all
Performance Period for Recertification
EBOM-2009 SSc5:Site development - protect or restore open habitatposted by Frances Yang on
For EBOM recertification purposes, my project is achieving SSc5 for the first time, through the off-site option. What I know: - For a first certification, we would get a contract to maintain an off