Forum quick links
Energy Recovery Bypass
NC-2009 EAp2:Minimum energy performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Future Alternative Compliance Paths
Pilot-Credits PC14:Walkable Streetsposted by Douglas Flandro on
I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar
C&D Waste Recycling Calculations for 200 yr-old bldg renovation
NC-2009 MRc2:Construction waste managementposted by Debra a. Lombard on
C&D Waste Recycling Calculations for 200 yr-old bldg renovation: This 200 yr-old brick building had a tremendous amount of old brick that was falling apart and needed to be taken out and re-po
Included wooded area in LEED boundary?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Erica Downs on
The project is on a college campus, and the site itself if previously developed.
Applicable spec divisions for MRc3
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Chris Sanders on
Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.
Decorative Exterior Lighting
NC-2009 EAp2:Minimum energy performanceposted by Saif Abdulameer on
Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.
New Option - Walking Path
Pilot-Credits EQpc78:Design for active occupantsposted by Garrett Ferguson on
On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.
certified wood credit
NC-2009 MRc7:Certified woodposted by Shawn Keith on
My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?
Permanent entry way to retail space in a mid-rise multi-family
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Morteza Kasmaei on
This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.
Calculating MRc4 - Recycable Material Credits
NC-2009 MRc4:Recycled contentposted by Richard Metts on
Please help me to clarify the following cost scenario's as they relate to calculating the MRc4 Material Credits. 1) Fabricated Structural Steel - Do you use the whole cost for the fabricated steel