Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Resort Hotel and Condo

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Zehren  on 

I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.

4
Default Avatar
Zehren and Associates
LEEDuser Basic Member
2 thumbs up
Fri Dec 18, 2015, 12:01 am

Winter resort

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  John Zehren  on 

Our project is located in a winter ski resort village with heavy snowfall. The likelihood of someone biking here in the winter is slim.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Dec 17, 2015, 4:53 pm

EBOM Campus and Performance Periods

EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management plan
posted by  Kath Williams  on 

How is the performance period determined when submitting EBOM campus credits under master site? Individual buildings will not be submitted for 8 more months but the campus credits are ready now.

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Dec 16, 2015, 9:06 pm

Historical Building

NC-2009 EAp2:Minimum energy performance
posted by  Khaled Fouda  on 

I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance.

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Dec 16, 2015, 4:05 pm

Lighting Controls Exemption

EBOM-2009 EAc3.1:Performance measurement - building automation system
posted by  Katherine Roth  on 

Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.

3
Tue Dec 15, 2015, 8:27 pm

CDPH v1.1-2010 Section 3.8.6.1

NC-v4 EQc2:Low-emitting materials
posted by  Craig Graber  on 

Hi, this is Josef Abboud with Atelier Ten. An aspect of the VOC general emissions evaluation is unclear: the definition within the LEED reference guide for the general emissions test claims the ma

2
Thu Dec 10, 2015, 2:51 pm

Guidance for IDEC Systems?

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  Dustin Campbell  on 

Does anyone have experience applying the “USGBC LEED 62MZCalc” spreadsheet for Indirect Evaporative Cooling (IDEC) systems? Or, is there an alternate compliance path elected due to the significant

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Wed Dec 9, 2015, 3:24 pm

M&V credit energy model calibration

NC-v4 EAp1:Fundamental commissioning and verification
posted by  MKK LEED  on 

With the removal of the M&V credit under LEED V4.0, is a calibrated energy model still required under Fundamental Commissioning and Verification credit or some other LEED credit?

2
Senior Commissioning Agent
LEEDuser Basic Member
16 thumbs up
Fri Dec 4, 2015, 6:14 pm

Economizer High-Limit Shutoff for Massachusetts

NC-2009 EAp2:Minimum energy performance
posted by  Ritwik Kakati  on 

We are working on a project in Massachusetts, and I wanted to clarify what the Economizer High-Limit Shutoff requirement for Baseline case. All of Massachusetts is listed as Climate Zone 5.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Dec 4, 2015, 12:08 am

the coffee pot and the refrigerator

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Michele Helou  on 

After hours of struggling with the absurdity of this credit on a project with a handful of new appliances and equipment - some that run continuously, some that don't, I decided to walk around the

5
Thu Dec 3, 2015, 7:29 pm