Light Pollution for Large Project Boundaries
Warehouses-EBOM-v4.1 SSc3:Light Pollution Reductionposted by Rick Fox on
I manage a 550k square foot warehouse operating at 24/7. All of our building lights, are LED and point down at the ground. Our pole lights are LED also and point down at a 45 degr
Lighting Control - Recording Studio
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After
Patient Rooms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Vanessa Hostick Rempe on
Does anyone have experience documenting this pilot credit on a hospital? It's unclear if the patient room should be included or excluded from the documentation and count.
Future medical office building - views methodology
CS-v4.1 EQc5:Quality Viewsposted by Jeremy Shiman on
We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB.
How do I calculate the total runoff, if I am required to send rainwater elsewhere?
EBOM-v4.1 SSc1:Rainwater Managementposted by Rick Fox on
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq
Averaging Facility Rates over Time
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick Rempe on
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Nikhita Sapuram on
Most WBLCA software programs do not include product specific data.
Schedule for Data Center Load
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?
Anyone been through full review of this credit yet?
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Joanna Switzer on
Just curious if anyone has lessons learned on this one yet?
Does LEED Project hours count towards LEED Specific CE Hours and Regular CE Hours
posted by Richard Metts on
Hello everyone, I am working on a LEED project and I am the person responsible for gathering and uploading the LEED data into the USGBC data base. My CE reporting date is coming up soon.