Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize energy performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and views - viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.
HVAC system wasn't running during construction
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Juanita Garcia on
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that
Exterior Shading Devices
NC-2009 IEQc8.2:Daylight and views - viewsposted by Sara Zoumbaris on
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.
Is the credit for during construction, or after envelope is up?
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Nelina Loiselle on
We have an issue with a General Contractor on a project.
Fuel Stations for Shared Parking Lot Outside of LEED Boundary
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Mary Kay on
Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.
Submitting this point in v2009
EBOM-v4 EQc9:Integrated pest managementposted by Tracy Smith on
I am submitting a project under v2009, but my pest control contractor has been encouraging us to switch to the v4 pest control guidelines instead of the v2009.
Upload requirements for EA Cr 4: Enhanced Refrigerant Management
NC-2009 EAc4:Enhanced refrigerant managementposted by Kathy Wislocky on
Hi, I'm hoping to get some feedback on what is actually required to be uploaded in support of table 4-1.
On-going Commissioning
EBOM-2009 EAc2.3:Existing building commissioning - ongoing commissioningposted by Tracy Smith on
We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.
Want to Appeal Denied SSc4.3
posted by Rachel Manoguerra on
We have submitted our design review and we got the report back. We want to appeal the about mentioned credit. In making our changes, the number of parking spaces has decreased by 6.