Questions about High-rise residential LEED Energy Modeling

NC-2009 EAc1:Optimize energy performance
posted by  Tommy Xing  on 

Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jul 9, 2015, 5:44 pm

Compliant area

NC-2009 IEQc8.2:Daylight and views - views
posted by  David Browne  on 

Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Jul 9, 2015, 2:07 pm

HVAC system wasn't running during construction

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Juanita Garcia  on 

If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that

2
Thu Jul 9, 2015, 12:47 am

Exterior Shading Devices

NC-2009 IEQc8.2:Daylight and views - views
posted by  Sara Zoumbaris  on 

Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Jul 8, 2015, 8:50 pm
6
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jul 3, 2015, 6:18 pm

Fuel Stations for Shared Parking Lot Outside of LEED Boundary

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Mary Kay  on 

Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Jul 3, 2015, 1:39 pm

Submitting this point in v2009

EBOM-v4 EQc9:Integrated pest management
posted by  Tracy Smith  on 

I am submitting a project under v2009, but my pest control contractor has been encouraging us to switch to the v4 pest control guidelines instead of the v2009.

2
Program Coordinator
Transwestern Sustainability Services
LEEDuser Expert
5 thumbs up
Fri Jun 26, 2015, 7:57 pm

Upload requirements for EA Cr 4: Enhanced Refrigerant Management

NC-2009 EAc4:Enhanced refrigerant management
posted by  Kathy Wislocky  on 

Hi, I'm hoping to get some feedback on what is actually required to be uploaded in support of table 4-1.

4
Fri Jun 26, 2015, 2:13 am

On-going Commissioning

EBOM-2009 EAc2.3:Existing building commissioning - ongoing commissioning
posted by  Tracy Smith  on 

We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.

3
Tue Jun 23, 2015, 4:09 pm

Want to Appeal Denied SSc4.3

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Rachel Manoguerra  on 

We have submitted our design review and we got the report back. We want to appeal the about mentioned credit. In making our changes, the number of parking spaces has decreased by 6.