Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Thermal Comfort Survey

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Leed User  on 

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and

5
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Thu May 21, 2015, 10:08 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2:Minimum energy performance
posted by  Sarah Simchuk  on 

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.

4
Wed May 20, 2015, 6:14 pm

Where to find the Ecologo-certified products?

EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materials
posted by  Helen Samuel  on 

Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?

2
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Tue May 19, 2015, 1:35 pm

EV Ready acceptable?

CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Dylan Connelly  on 

For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?

2
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Mon May 18, 2015, 8:00 pm

EAc5 Option 3

NC-2009 EAc5:Measurement and verification
posted by  Sheryl Swartzle  on 

Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon May 18, 2015, 7:34 pm

Tools for demonstrating solar orientation

Homes-v2008 IDc1:Integrated project planning
posted by  Erica Downs  on 

Is anyone aware of any tools for demonstrating the east-west axis of the house is within 15 degrees of due east-west? Or do I need to bust out my protractor?

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Mon May 18, 2015, 3:39 pm

LEED NC 2009 Group Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Neumann Monson  on 

Our project consists of two buildings on a shared site, to be built in two phases.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu May 14, 2015, 4:25 pm

Combined Staff Break Room and Cleaning Materials Storage

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Ryan Hoffman  on 

Our project is the renovation of a space that will be cleaned by an outside contractor.

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Thu May 14, 2015, 4:08 pm

International Projects

General forums
posted by  Marcus Sheffer  on 

I was wondering how much of the decision to delay was due to international uptake.

7
Thu May 14, 2015, 1:26 pm

Is a borrow pit considered "previously developed" land?

ND-v2009 SLLp5:Floodplain avoidance
posted by  Jason Franken  on 

Our project includes a large location that was disturbed and altered for use as a borrow pit during the construction of a nearby interstate highway.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed May 13, 2015, 7:46 pm