Data cabling and carpet quantity difficulty

Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materials
posted by  Deb Favaretto  on 

The language of the Pilot Credit now requires Communications (data cabling). 

1
Fri Aug 30, 2024, 6:21 pm

Infection control resistance to WaterSense fixtures

Healthcare-v4.1 WEp2:Indoor Water Use Reduction
posted by  Margaret Montgomery  on 

Has anyone run into a challenge with patient room faucets? We seem to have an infection control team that won't allow less than the 2.2 gpm flow rate, which is not WaterSense compliant.

1
Fri Nov 11, 2022, 8:32 pm

Preferred Parking for Electric Vehicles

NC-v4.1 LTc8:Electric Vehicles
posted by  Catherine Blakemore  on 

Do the electric vehicle parking spaces need to be located within a certain distance of the building entrance?  If yes, what is maximum allowable distance and is this distance a radial distance

2
Mon Nov 7, 2022, 2:36 pm

Using LEED Min IAQ Performance Calculator for LEED-HC v4

Healthcare-v4 EQp1:Minimum indoor air quality performance
posted by  Mark Benson  on 

The new USGBC-provided "Minimum IAQ Performance Calculator" appears to be applicable to LEED 2009 and LEED v4 projects in that it includes calculations for ASHRAE 62.1-2007 and 2010.

7
Wed Nov 2, 2022, 10:09 pm

Will a TSCA Title VI Certification Provide Credit for LEED Points?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Angela Rogers  on 

I have a project looking to get LEED credit for kitchen casework. The boxes will be made of melamine-faced particleboard and the doors made of MDF. 

4
Sustainability Consultant
Steven Winter Associates
LEEDuser Basic Member
12 thumbs up
Wed Nov 2, 2022, 2:04 am

Performance Periods in LEED-EBOM: Rules to Follow--Do these apply to EBOM 4.1?

Performance Periods in LEED-EBOM: Rules to Follow
posted by  Brian Salazar  on 

Hi.  We’re working on a LEED EBOM 4.1 project, and I’m trying to understand whether the performance period rules are different for LEED 4.1 than for 4.0.  We took a first pass through the

0
2
Program Manager
UL Solutions
LEEDuser Premium Member
10 thumbs up
Tue Nov 1, 2022, 3:50 pm

Cooling Water Treatment

LEED v4.1 Discussion Forum
posted by  Victoria Dubeau  on 

Is there any guidance or specification around the water treatment of a cooling water system.

0

Client wants to pursue C&S certification AFTER construction is complete.

LEED Rating System Selection
posted by  Kevin Brock  on 

Client wants to pursue C&S certification AFTER construction is complete.  

Any chance at all this can be done??  THX

 

0

Project Certification Question

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Teaaron Frye  on 

My company completed a project in 2020 that was to be LEED certified (was Silver but the designers later realized midway thoughthe project that it wasn't possible) and I was brought in to try