Data cabling and carpet quantity difficulty
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Deb Favaretto on
The language of the Pilot Credit now requires Communications (data cabling).
Infection control resistance to WaterSense fixtures
Healthcare-v4.1 WEp2:Indoor Water Use Reductionposted by Margaret Montgomery on
Has anyone run into a challenge with patient room faucets? We seem to have an infection control team that won't allow less than the 2.2 gpm flow rate, which is not WaterSense compliant.
Preferred Parking for Electric Vehicles
NC-v4.1 LTc8:Electric Vehiclesposted by Catherine Blakemore on
Do the electric vehicle parking spaces need to be located within a certain distance of the building entrance? If yes, what is maximum allowable distance and is this distance a radial distance
Using LEED Min IAQ Performance Calculator for LEED-HC v4
Healthcare-v4 EQp1:Minimum indoor air quality performanceposted by Mark Benson on
The new USGBC-provided "Minimum IAQ Performance Calculator" appears to be applicable to LEED 2009 and LEED v4 projects in that it includes calculations for ASHRAE 62.1-2007 and 2010.
Will a TSCA Title VI Certification Provide Credit for LEED Points?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Angela Rogers on
I have a project looking to get LEED credit for kitchen casework. The boxes will be made of melamine-faced particleboard and the doors made of MDF.
Performance Periods in LEED-EBOM: Rules to Follow--Do these apply to EBOM 4.1?
posted by Brian Salazar on
Hi. We’re working on a LEED EBOM 4.1 project, and I’m trying to understand whether the performance period rules are different for LEED 4.1 than for 4.0. We took a first pass through the
Greenguard Gold in a First Floor of Home environment...
NC-v4.1 EQc2:Low-Emitting Materialsposted by Patty Karapinar on
Hello,
Cooling Water Treatment
posted by Victoria Dubeau on
Is there any guidance or specification around the water treatment of a cooling water system.
Client wants to pursue C&S certification AFTER construction is complete.
posted by Kevin Brock on
Client wants to pursue C&S certification AFTER construction is complete.
Any chance at all this can be done?? THX
Project Certification Question
posted by Teaaron Frye on
My company completed a project in 2020 that was to be LEED certified (was Silver but the designers later realized midway thoughthe project that it wasn't possible) and I was brought in to try