Forum quick links
Option 1: Path 1 - High School Census Tract vs Attendance Area
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Kristian Kicinski on
I am working on a high school project located in Seattle. The school serves a predominantly black student population in a historically underserved neighborhood.
CDPH VOC Emissions Certificate Expired
NC-v4 EQc2:Low-emitting materialsposted by Peter Doo on
I have a submittal that includes a resinous flooring product for which the CDPH 01350 v1.2-2017 VOC emissions testing certificate expired in September of 2019.
Commitment to Share Data - Military Facility
NC-v4 EAp3:Building-level energy meteringposted by Dane Andersen on
Has anyone worked on LEED certification for a military facility?
eQUEST DOE2.3 for LEED V4 EAp2 and EAc1
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello Everyone,
EQc4 - IAQ Assessment, Option 1. Flush-Out, Path 1. Before Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Theresa Lehman on
If the humidity exceeds the range (higher than 60%) for a couple of hours, can the team simply add those few hours onto the flush-out, or does the flush-out have to start completely over at the tim
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Commercial Interior Project Information - Site Plan
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I'm working on a commercial interior project for LEED v4 rating system. Under the Project Information form, it asks for site plan. What would I provide for a project located on the
ACP for No Cooling Tower
Pilot-Credits WEpc94:No Cooling Towerposted by Natalie Terrill on
This is a straight forward, easy to document credit for projects that can demonstrate compliance.
BDC v4.1 - Option 2 - Path 2 - Affordable housing at winery
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Kevin Gilleran on
Hi,
SSpc158 Feedback Survey errors
Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantingsposted by Courtney France on
FYI, or updates from others welcome if fixed online, Feedback Survey hosted through WUFOO for SSpc158 was errored. Required responses for SSpc154 thru 158, even though project was not applica