NC-v4 EAc3:Advanced energy meteringposted by Edgar Arevalo on
It's been pretty easy to find advanced electrical submeters that meet all the characteristics from LEED, but it's been such as challenge to find one for natura gas intake.
v4.1 Schools Option 1 Path 2 Connected Site as an Alternative Compliance path in v4 BD&C New Construction
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Jerimiah Luckett on
Project is a City Transportation (Bus) Maintenance Facility, location is on the backside of an industrial area abutting a shipping/industrial railyard to the south and warehouses, industrial b
Phased Development - Demoing Building for Parking Lot
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Deb Favaretto on
Hi,
62.1 vs 170
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dianne Herrin on
Hello - I am working on a new construction VA Medical Center that has been designed using the ventilation rates in ASHRAE Standard 170-2008 as per the v4 NC-Healthcare.
RECs for project supplied by campus central utility plant?
NC-v4 EAc7:Green power and carbon offsetsposted by Erin Holdenried on
Can RECs be used for project located on a campus with a central plant that generates its own electricity for the campus? It is a cogen plant that also supplies steam and chilled water.
Low Emitting Materials Calculator and Precast Wall Panels
NC-v4 EQc2:Low-emitting materialsposted by Teaaron Frye on
In regards to the low emitting materials calculator (v4.1) what is the proper way to document insulated and non-insulated precast concrete wall panels.
ASHRAE 90.1 all electric baseline?
NC-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi all,
Situation:
Perimeter light levels affected by surrounding sites.
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Rick Walls on
The perimeter light levels are driven by the surrounding light sources such as street lights and adjoining building lights. Do I need to make note of these factors in the credit form?
Pilot -All-Gender Restrooms
CI-v4 INc1:Innovationposted by Laurie Johnson on
I am pursuing the ALL-Gender Restrooms Innovation. Under Requirments for ID+C it reads Restrooms must be included within the project scope of work in order to pursue this pilot credit.