Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Water Budget Calculation

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Jason Biondi  on 

What if there is no premanant irrigation as well as no stipulated process water (chiller, cooling towers, commercial kitchens, healthcare water systems) usage ?

1
Wed Jun 29, 2022, 2:16 pm

Pilot Credit - LTpc134 Advanced Transportation Monitoring - how do you share the data?

CS-v4.1 INc1:Innovation
posted by  Lauren Leatherbarrow  on 

For LEED v4 Core & Shell 14 story office building in USA with underground garage we are attempting this credit - monitoring the garage traffic and at the elevator turnstiles.  The requirem

1
Sun Oct 30, 2022, 10:10 pm

Exempt from Indoor Water Efficiency pre-requisite?

NC-v4 WEp2:Indoor water use reduction
posted by  Lawrence Lile  on 

We have a project that includes no bathrooms, kitchens, or other indoor water use.  There is an industrial process that uses water, which we will address separately.  Can we claim exempti

6
Wed Jun 15, 2022, 9:34 pm

ECOREGION LEVEL III PLANT LISTS??

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Sara Hicks  on 

Anyone have a suggestions on how to find native plants as specific as the ecoregion required? I can't find any resources that provide this information.
 

2
Tue Jun 14, 2022, 5:09 pm

CLT Buildings

CS-v4.1 MRc3:Sourcing of Raw Materials
posted by  Marelle Davey  on 

Hi - has anyone targeted this credit for a CLT building?

0

Building Area Method and Space-by-Space Method for lighting power density

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Ying Lindsey  on 

Dear All,
I have a question regarding lighting power density with the building area method and with the space-by-space method.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Jun 8, 2022, 5:18 am

Correctional Facility lighting

NC-v4 SSc6:Light pollution reduction
posted by  Lawrence Rennell  on 

Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?

1
Mon Jun 6, 2022, 9:42 pm
1
Fri Sep 23, 2022, 10:21 am

Commissioning on C&S building not complete because of push back

CS-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Edgar Arevalo  on 

My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings.  The commissioning agent was suppose to test those fans but the mechanical contractor

3
Energy/Sustainability Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Fri May 27, 2022, 2:26 pm

v4.1, and Photovoltaic VE

NC-v4.1 EAc2:Optimize Energy Performance
posted by     on 

We are working on a warehouse in Sunnyvale, CA.  We are confused with the results from the spreadsheet (v3), since we investigated removing the PV array, as a VE measure.  Site Energy, Co

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon May 23, 2022, 8:37 pm