Forum quick links
University Campus - Area outside LPB designated as "preserved and protected" greenfield or restored area allowed?
NC-v4 SSc2:Site development - protect or restore habitatposted by Erica Downs on
Does anyone know if, on a University Campus, the owner is still allowed to designate the equivalent required area as "protected for the life of the building" somewhere outside the LPB?
Timeline to join for project team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Christoph Weindl on
We're pursuing "Social equity within the project team" with Option 2.
stronger feedback loop
Pilot-Credits EQpc114:Learning controls for thermal comfortposted by Brightworks Sustainability on
In implmenting this pilot credit on multiple projects now we have been very pleased with the strengthening of the feedback loop with occupants.
LEED documentation tools?
posted by Lily Li on
Dear LEED users! Have you come across any tools that make LEED design documentation easier?
Determining Retention Requirements
NC-v4.1 SSc4:Rainwater Managementposted by Callie Reymann on
Our rainwater calculations are right on the cusp of reaching the 90th percentile and earning the full three points (+ regional priority point) for this credit.
Using Autocase to document SSpc113
Pilot-Credits SSpc113:Informing Design Using Triple Bottom Line Analysisposted by Jennifer Wehling on
We used Autocase to document this pilot credit.
Protected or preserved trees in calculator
Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantingsposted by Courtney France on
For 'Protected', or preserved, trees on an existing site, are teams required to include them in BOTH the baseline and design case i-Tree calculations? Exclude from both cases to avoid extra d
Inclusive Design Pilot Credit
Pilot-Credits INpc125:Inclusive Designposted by CodeGreen Solutions on
Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners.
Phased Core & Shell + CI Project
posted by Mauricio Feldsberg on
My client is going to renovate a building that they currently own and will be the sole tenant of.
Integrative Analysis of Building Materials-- How to Get Manufacturer Buy-In?
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Marina Rullo on
I've completed this pilot credit a few times now, and I'm wondering if anyone else has thought about this: what is the incentive for manufacturers to disclose this information upfront?