Design Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Aaron Kennedy  on 

We are finishing up the design submittal to submit for review, but I cannot find where the overall plans are supposed to be submitted?  Am I missing it somewhere or Is there not a place to sub

2
Robert Rollings Architects
LEEDuser Basic Member
2 thumbs up
Fri Jun 4, 2021, 8:08 pm

CO2 monitoring in return air ductwork in a behavioral health facility

Healthcare-v4 EQc1:Enhanced indoor air quality strategies
posted by  Bethany Beers  on 

We are currently designing a behavioral health inpatient facility in the Seattle area. Per local codes, demand control ventilation is required and is allowed in the return air ductwork for spaces.

0

rainwater reuse on site

CS-v4 SSc4:Rainwater management
posted by  Alfonzo Farber  on 

We are working with a building in an urban core area that wants to upsize the stormwater retention tank to capture all rainwater on site.  They then plan to use the water for irrigation, cooli

0
1
Tue Jun 1, 2021, 6:11 pm

EV Charging Stations

Healthcare-v4 LTc8:Green vehicles
posted by  Dianne Herrin  on 

Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.

4
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Mon May 31, 2021, 10:33 pm

Equity Plan examples?

CS-v4.1 LTc3:High Priority Site and Equitable Development
posted by  Casey Cullen-Woods  on 

Hello, I am working on a Core and Shell Office Building that does not mee tthe v4 pathway for this credit.

1
Fri Jun 4, 2021, 1:48 pm

Lighting coordination with Thermal Comfort

NC-v4 EQc6:Interior lighting
posted by  Laura strauss  on 
  1. Are Janitors Rooms, Storage Rooms, Electrical Rooms, Mechanical Rooms, Elevator Rooms, (not normally occupied rooms) required to conform with controls if listed in the thermal comfort submit
1
Tue May 25, 2021, 1:28 am

Life Cycle Assessment all or none points

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Katie Vasbinder  on 

for the Life Cycle Assessment is it all 3 points or none? so you cannot get 1 or 2?

1
Mon May 24, 2021, 4:32 pm

IAQ Assessment - Air Testing

CI-v4 EQc4:Indoor air quality assessment
posted by  Harvard University Green Building Services  on 

For one of our LEEDv4 CI projects the project team was looking to conduct Air Testing in order to meet the credit requirements for the Indoor Air Quality Assessment credit.

9
Building Performance Analyst/Designer
Page
LEEDuser Basic Member
3 thumbs up
Mon May 17, 2021, 12:10 am

Low-emitting solid surface materials?

NC-v4 EQc2:Low-emitting materials
posted by  Lew Bonadies  on 

Should resin-based solid surface materials applied as countertops, divider panels, reception desk cladding etc. provide low-emitting testing documentation?

2
Facility Leaders in Architecture
LEEDuser Premium Member
1 thumbs up
Thu May 13, 2021, 10:02 pm