Forum quick links
Remember People, Design for a Community's Uniqueness - SEED Network - Social Equity Public Interest Design
Pilot-Credits IPpc89:Social equity within the communityposted by Jeffery Davis on
The NE Stockton Library and Recreation Center will be one of the newest buildings built in the northern part of Stockton.
Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Laura Heagler on
Does a "shared lane" qualify to be included as part of a bicycle network? Here in Wichita KS they are designated by a sharrow symbol painted on the street.
Furniture to include in LEM documentation?
NC-v4 EQc2:Low-emitting materialsposted by Erica Downs on
Under v3, only systems furniture and desk/occasional seating were included. Under v4/4.1, is ALL (non-permantly installed) furniture now included? What counts as a piece of furniture?
collect rainwater in swimming pools?
NC-v4 SSc4:Rainwater managementposted by Alfonzo Farber on
Can outdoor open-air swimming pools be counted toward rainwater collection areas? If the pool is constructed and maintained such that the water level always allows enough space for the local
Low Emitting Materials Calculator
NC-v4 EQc2:Low-emitting materialsposted by Lawrence Rennell on
The LEED V4 guidebook states under the bold headline: Additional VOC content requirements for wet applied products.
Irrigated areas and vegetated non-irrigated areas - How to include in calculator?
NC-v4 WEp1:Outdoor water use reductionposted by Erica Downs on
The reference guide's step-by-step language says:
Landscaping near the facade
Pilot-Credits SSpc55:Bird collision deterrenceposted by Michelle Halle Stern on
One of my teammates has raised a concern that we aren't eligible for this credit if plantings are located near the facade. I don't see any mention of that requirement in the credit language.
Education Session/Survey Requirement in LEED v4 Projects
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Brad Newkirk on
I am working on a LEED-CI v4 project that has registered for this Pilot Credit.
For submittal requirements in the USGBC Pilot Credit Library it lists that projects will need to provide:
General Emissions Evaluation criteria for flooring assemblies assembled off-site
NC-v4 EQc2:Low-emitting materialsposted by Jeff Wiedmeyer on
I've read through the posts related to this subject but for laminating adhesives and millwork. My question is similar but pertains to the requirement for a flooring assembly assembled off sit