How to validate applicability of Tier 2 & 3 RECs
NC-v4.1 EAc5:Renewable Energyposted by Joyce Kelly on
An organization contracts with a local utility to exclusively purchase energy from renewable sources for 20 yrs.
Project relocated to a new site
NC-v4 IPc1:Integrative processposted by Sara Goenner Curlee on
I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?
Legal Sources and Responsible Sources
Pilot-Credits MRpc102:Legal Woodposted by on
I'm trying to pursue this Pilot Credit and see that it has to be wood from legal source (100%) and Responsible Sources (70%).
Labs ramping up for v4.1?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Erica Downs on
I'm hearing from a potential EHS contractor that the testing labs are having a hard time ramping up to meet the testing requirements of v4.1, and the testing is going to be quite expensive. I
Are VOC Budgets standard practice?
NC-v4 EQc2:Low-emitting materialsposted by Rick Farrell on
As a commercial "wood only" flooring contractor we often do site finished
What transit qualifies?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Peter Doo on
Is this credit earned if amenities are provided for transit stops that do not meet the frequency requirements of SLL Access to Quality Transit?
Walkable Sites
NC-v4 INc1:Innovationposted by Marie Bizzak on
Can anyone help me understand the language in Walkable Site #3? It says:
Reduction Success Rates for Bird Collision Deterrence Methods
Pilot-Credits SSpc55:Bird collision deterrenceposted by Samuel Palmer-Dwore on
I know that bird collision deterrence methods will affect different species in various amount, at different times of year and different locations.
Campus project with Central Plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.