LEED Boundary with Main Building, Parking Garage & Parksmart
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ralph Bicknese on
We have a new 609,000 sf building seeking LEED BD+C v4 certification. A new 1800 space parking garage will be built design-build as part of the project but by separate designer, same CM.
Lead-free paint
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Mark Meaders on
I was looking to see if there is a threshold that states the amount of lead in paint that is considered lead-free (something along the lines of what is stated for pipes or flux).
25% Threshold?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Douglas Flandro on
In the LEEDUser's take on this credit there is a sentence that says, "There is no minimum threshold of recycled content
Rooftop Pool
NC-v4 SSc5:Heat island reductionposted by Danielle Waters on
If a residential project with a rooftop pool wants to pursue SSc5-Option 1, but how does the pool full of water impact the calculations? Is the pool sq.ft.
EQpc117: Quality views in nonregularly occupied spaces.
NC-v4 INc1:Innovationposted by Marie Bizzak on
We are working on a project that is already getting an exemplary credit for quality views. Is it possible to get this exemplary credit in addition to the pilot credit?
No Minimum Local Requirements
CS-v4.1 LTc7:Reduced Parking Footprintposted by Atlas Turner on
Hi All,
Calculation of Option 1 - Paths 1 or 2
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Brian Kish on
We have a renovation project in downtown Pittsburgh and trying to complete documents to achieve LEED v4.1 ID+C rating system.
Water-resistant flooring
Homes-v4 MRp2:Durability managementposted by Alec Luong on
The credit states to "use water resistant flooring; do not use carpet." Is there a specific list of what LEED considers to be water resistant flooring?
Legal Wood -pilot alternative compliance path
Pilot-Credits MRpc102:Legal Woodposted by Dustin Davis on
We are very excited about this new legal wood alternative path and a question has come up during the DD phase.
Requirements for LEEDv4 BD+C Tenant Guidelines
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Helene Lefkowitz on
I am working on a project that will have incomplete spaces that will be finished by tenants.