Required percentage of vegetated area.
CS-v4 SSc3:Open spaceposted by Susan Di Giulio on
I have attended numerous seminars, including an all-day workshop at GreenBuild, on V4 and V4.1, and every time I was told that for this credit, the minimum required vegetated area is 25% of the 30%
Do not have LEED AP yet, but colleague does
NC-2009 IDc2:LEED Accredited Professionalposted by Edgar Arevalo on
I have been trying to find time to take the LEED AP exam but other projects that I'm a part of have been taking up my time that it makes it difficult to study now. However, my colleague who i
Meters for every floor? One Tenant Building
CI-v4.1 EAc3:Advanced Energy Meteringposted by Susan Di Giulio on
In our CI Project, we have a single Tenant. Per this credit, is a meter required for every floor of this 8 floor building? We believe that is not required for this CI project.
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by Kent B on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.
Ventilation for the building as a whole or by space?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Greenwood on
Can you meet the enhanced ventilation performance criteria by providing >30% ventilation for the building as a whole, even if you do not meet this performance for all zones/spaces?
SSc5 Offsite Restoration Contract/Performance Period
EBOM-2009 SSc5:Site development - protect or restore open habitatposted by Randi Davis on
The performance period for our project is only 90 days.
Floor tile system components
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Monica Verastegui on
Our project has a porcelain tile floor with an anti-fracture and waterproofing membrane under it. Does the membrane product need to meet requirements for IEQc4.3?