Forum quick links
LEED 2009 NC - Adding an ID Credit after Design Review
posted by Michael Asaro on
I'm trying to add (3) Innovation credits after our design review phase. Icannot find how to add an ID credit anywhere in the LEED Online system. How is this accomplished?
How to consider Emergency Lamps for this credit?
CS-v4 SSc6:Light pollution reductionposted by Milo Aguilar on
Our design review came back and for this credit they are asking to provide specs for all the lamps used for the credit including the emergency lamps. We have tried to find lamps with the
Hotel with no guest.
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Michael Ortiz on
How would one calculate the energy used if there are not any guest to calculate for? Covid-19 will change many of the models we use and highlights the need to look at plug load as a real cost.
Bio-based Materials - Landscaping plantings?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on
Has anybody ever looked into trying to get landscaping plantings (grass, trees, schrubs) to be accepted as a compliant bio-based material?
Pilot credits eligible for Campus
NC-v4 INc1:Innovationposted by Chloe Naese on
Hi, I was wondering what pilot credits were eligible to pursue for the Campus approach.
Documentation for LEED campus
NC-v4 MRp1:Storage and collection of recyclablesposted by Chloe Naese on
I was wondering what documentation should be submitted for this credit if we are pursuing LEED campus?
Bulk Water Deliveries
NC-v4.1 WEc2:Indoor Water Use Reductionposted by Carrie Cardona on
Hello -- I have a question regarding bulk water deliveries and how they might affect water and/or energy use credits.
Commingled waste and numbers of waste streams
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Bryna Dunn on
Is there a documented environmental benefit to all the extra red tape we have to wade through "for LEED points" for projects where collecting in a commingled bin is actually the most likely way to
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009
NC-2009 EAp2:Minimum energy performanceposted by Susan Di Giulio on
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009
NC-2009 EAp2:Minimum energy performanceposted by Susan Di Giulio on
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?