Forum quick links
Software limitations
NC-2009 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello
Adaptability vs Flexibility
Healthcare-v4 MRc8:Design for flexibilityposted by Margaret Montgomery on
We have a project planning a facility with about 200 beds, planning to use standardized prefab headwalls in the patient rooms, as well as standardizing room layouts to work for multiple room types
Associated Grounds Metering
NC-v4 WEp3:Building-level water meteringposted by Nathan Gauthier on
We got a response back from GBCI today for WEp3 after asking about the metering requirement for the "associated grounds".
Open space 30% requirement at Ground Level only?
NC-v4 SSc3:Open spaceposted by Susan Di Giulio on
Can you include open spaces at roof level (Green roof, accessible by all) as part of the 30% requirement, or does the entire 30% need to come from open space at ground level only?
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sherman Aronson on
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?
Composite Wood Doors
NC-v4.1 EQc2:Low-Emitting Materialsposted by Katie Breshears on
The credit language states that the composite wood category includes all particleboard, medium density fiberboard, hardwood veneer plywood, and structural composite wood not included in the floorin
green builders in New England
posted by DiegoMaxwell DiegoMaxwell on
Hey, I just found this sub, so apologies if this post isn't appropriate.
district energy - does the plant need to follow same ASHRAE standard?
NC-v4 EAp2:Minimum energy performanceposted by Craig Flandermeyer on
Project is utilizing energy from a central plant, the team is attempting to decide between using the purchased energy approach vs.
Exterior Lighting Requirements
Pilot-Credits SSpc55:Bird collision deterrenceposted by Rick Tucker on
With the advances in exterior LED lighting drivers and controls, would it make sense to look at dimming exterior lights down to say 10% in lieu of turning them off completely from midnight to 6am a
Define "transit route" for the extra point gained with no on route providing more than 60% of the documented levels
NC-v4 LTc5:Access to quality transitposted by Evie Bird on
Pertaining to this extra point in LEED v4 -"Projects served by two or more transit routes such that no one route provides more than 60% of the documented levels may earn one additional point, up to