Forum quick links
Zones served by mutli-zone unit but is exhausted separately
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
This may be nothing, but should I still count for zones that are served by a multizone unit but the ventilated air is not recirculated back to the unit? The air is pretty much exhausted throu
RCI Visual Inspections - STILL???
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Kimberlee Ilardi on
We have a project that is using a Certified Commingled Recycling Facility for their single-stream recycling and they are giving us visual inspections, with a breakdown of each waste strea
Exterior Noise Control
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Alan Burt on
This project had several challenges related to exterior noise, it is in a busy area near downtown and at the time exposed to higher than typical noise levels from the exhaust system serving an unde
VOC/Emissions documentation for Casework/Millwork
CI-v4 EQc2:Low-emitting materialsposted by Tracy Marquis on
I am looking for some clarification pertaining to the VOC and emissions requirements for Casework and Millwork.
LEED Documentation /Back Up
NC-2009 MRc5:Regional materialsposted by Heather Young on
I have been recently told that I need more proof on the distance of the Steel Mill to the job site to justify regional materials.
O+M Table of Contents requirement for v4 Fundamental commisioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Robert Fernandez on
I provided our primary LEED review with all of the following individually as each has its own upload to meet the intent of the credit but am being requested for an O+M table of contents for Fu
LEED for Homes with Exterior Energy Uses- Prescriptive
Homes-v4 EAc1:Annual energy useposted by Angela Loughry on
I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt. I understand that you can go Option 1 under annual energy use. What is unclear
Innovation Credit: Walkable Project Site
CI-v4 INc1:Innovationposted by Patty Lloyd on
The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.
Renewable Energy production
posted by Ruju Rathod on
We are working on an individual building within a campus. A parking structure will have solar panels.
Can our building apply for points under Renewable Energy Production if,
Biophilia and Renovations
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick Rempe on
Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a greater