Forum quick links
Baseline pressure drop adjustments
NC-v4 EAp2:Minimum energy performanceposted by Boris Jonjic on
Hi all,
I've got a question about calculating the pressure drop adjustments for a baseline building. I'm using LEED v4, ASHRAE 90.1 2010.
Issues Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:-
we have working LEED Group Project Building with 5 nos of Building
Review comment on PV-A report
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Dear all,
50% of Receptable Controls to meet the Prerequisite
NC-v4 EAp2:Minimum energy performanceposted by Kritika Kharbanda on
We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Exceptional Calculation for Process Loads Without Recent Conventional Practice
NC-v4 EAp2:Minimum energy performanceposted by Philip Harsh on
Hi all,
Baseline heating source where no fossil fuel is provided to building
NC-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
G3.1.1 exception d exhaust hood airflow baseline
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces
NC-v4 EAp2:Minimum energy performanceposted by Mini Laird on
We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,