Forum quick links
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this credit.
Fire Station Implementation
Pilot-Credits WEpc147:All-Gender Restroomsposted by Katie Amos on
We are attempting this pilot on several local Fire Stations as each restroom is individual and not gender specific.
Easily Achievable Where Mandates are in Place
Pilot-Credits SSpc129:Comprehensive Compostingposted by Marsha Gentile on
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.
Pursuit of Procurement of Low Carbon Construction materials
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Patty Marr on
Our project in Kirkland, WA has pursued this credit.
Development of efficient workflow for integrating material analysis
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Amanda Tullos on
Has anyone developed an efficient workflow for integrating material analysis early in design without significantly increasing project schedules?
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this pilot credit.
Is a TVOC emissions evaluation for an epoxy flooring system's topcoat acceptable?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Lutfi-Hisham Muhammed on
We are managing the new construction of a pharmaceutical production facility where we have an epoxy flooring system to be installed which consists of a primer, application of the main product (prod
Whole Project Water Use Reduction
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Mo Chesh on
This is the first time I have implemented this pilot credit/ACP.