ASHRAE 90.1-2016 and v4
NC-v4 EAc2:Optimize energy performanceposted by Mark Meaders on
Has anyone used ASHRAE 90.1-2016 as a baseline for a v4 project and know what the adjustment in points would be for this baseline?
Single-zone System (exception 'b' to G3.1.1) dealing with
NC-v4 EAc2:Optimize energy performanceposted by Ale g on
How do you deal with exception (b) to G3.1.1?
Documentation of Efficiency Measures/ Analysis
NC-v4 EAc2:Optimize energy performanceposted by Michelle Christopher on
For a few v4 projects I have twice now recieved comments during review that say the following:
Semiheated
NC-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
I have not yet found a clear description of the way of modelling a semiheated zone, so I will attempt to summarize. Please correct/append where needed.
DES methodology
NC-v4 EAc2:Optimize energy performanceposted by Ricardo Sá on
Dear All,
we’re currently working on LEED certification projects with the following characteristics:
Off-site renewables calculated in Optimized Energy Performance in LEED v4
NC-v4 EAc2:Optimize energy performanceposted by Deb Favaretto on
Hi,
Proving Savings for a Utility-Owned Power Plant
NC-v4 EAc2:Optimize energy performanceposted by Michael Hill on
I am wondering if anyone has any thoughts on how/if energy savings could be demonstrated for a Utility-Owned Electric Power Plant (just the plant itself).
Multiple Pilot Credit (EApc111 7 EApc95) Implementation on EAc2
NC-v4 EAc2:Optimize energy performanceposted by Rahil Shah on
Hello Everyone,
I hope everyone is doing well and staying safe.
Climate Data for Energy model -which year to use?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leed Users,
Min outside air requirements for unoccupied spaces/buildings - energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi all,
We have an unoccupied building (sub station) that has corridors, toilet etc for very occasional maintenance occupancy.