Forum quick links
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
Can COMcheck be used for EAc2 compliance ?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Economizer for VRF and other systems as per ASHRAE 90.1-2010 requirement
NC-v4 EAc2:Optimize energy performanceposted by Micaela Smulevich on
when working With Roof Tops machines and commercial split system or water chiller with air handling units I consider the economizer is required as per ASHRAE section 6.5.1, is this correct?&nb
Lab Exhaust Fan Power - ASHRAE 2013
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi,
Points in Addition to Renewable Energy Production?
NC-v4 EAc2:Optimize energy performanceposted by Dianne Herrin on
Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Question on Table 6.5.3.1.1B of ASHRAE 90.1-2010 - How is prssure drop of the Air Heat recovery system of the base calculated?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Please give me a feedback if I have calculated right the Fan Power of the baseline building.
Control of Energy Recovery System in the Baseline Building: Is an Economizer required or not?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leed users,
Baseline building based on ASHRAE 90.1-2010: