ASHRAE 90.1-2016 Appendix G Baseline Heatsource
CI-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
We are working on a LEED v4.1 BD+C project where the proposed design uses both District Hot Water (Purchased Heat) and District Chilled Water (Purchased Cooling).
ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
Energy model pump baseline for ultra tall buildings
CI-v4 EAp2:Minimum energy performanceposted by Samantha Allen on
Has anyone run up against issues in energy modelling for spaces in ultra tall buildings? LEED baseline in IES 6x lower than the actual for the building.
LEED v4 ID+C – Baseline Envelope Clarification (ASHRAE 90.1-2010)
CI-v4 EAp2:Minimum energy performanceposted by Sen Abraham on
Hello,
We are working on a LEED v4 ID+C office fit-out project with no envelope modifications — the envelope is entirely outside our scope of work.
Space-by-Space Method / Exceptions to Interior Ligtiing Power Allowance
CI-v4 EAp2:Minimum energy performanceposted by James Pack on
Hi
How to show the GHG Emission calculation for the new Energy update
CI-v4 EAp2:Minimum energy performanceposted by Nagaraj Sankar on
Dear Kudos,
Credit for unregulated loads
CI-v4 EAp2:Minimum energy performanceposted by Jeremy L. on
The credit states that we can "use the COMNET modeling guidelines and procedures to document measures that reduce unregulated loads".
Energy modeling for Half a Floor
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So we are facing a new Commercial Interior project that only takes up approximately half of a floor. The problem we are facing is if we can conduct an energy model for half of floor. Th
Mandatory Requirements and LEED
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
Hi,
Proposed Design Demand Control Ventilation
CI-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi all,