Carpooling/preferred parking req for mixed use buildings.
ND-Plan-v4 NPDc5:Reduced parking footprintposted by Emily Smith on
I have a project that is questioning the 10% carpool/shared use vehicle spaces requirement for all non-residential and mixed use buildings.
Total Annual Consumption
CI-v4 EAc3:Advanced energy meteringposted by Deborah Stadler on
Our CI project is not doing an energy model, but using the prescriptive method (AEDG). What is the acceptable way to determine the Total Annual Consumption to confirm uses above the 10% that
Alternatives to whole building meter in a multifamily
NC-v4 EAp3:Building-level energy meteringposted by Camilo Velez on
Good afternoon,
Modeling Exterior Envelope and Construction
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi,
Steel Finishing Products and VOCs
CI-v4 EQc2:Low-emitting materialsposted by Akos Brandecker on
We are working on a number of projects where a large amount of internal metal staircases and other architectural steel elements need finishing and painting on site.
No Mow Grass
Schools-NC-v4 SSc2:Site development - protect or restore habitatposted by Cynthia Kaplan on
Can my school project utilize No Mow grass as part of our site restoration, or would this still be considered a monoculture?
Modeling baseline building envelope for CI project, Purchased energy (condenser water)
CI-v4 EAp2:Minimum energy performanceposted by Yousef Abougabal on
Project Type: LEED ID+C (CI) Version 4
Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance
Solar powered parking lot lights
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by renewable energy?
INDIA ACP Interior lighting
NC-v4 EQc6:Interior lightingposted by Lalitya Reddy on
Hello LEEDusers,
I am looking for guidance on Interior Lighting credit in LEED v4 and v4.1
Direction for testing new and retrofitted equipment
CI-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Dear all,
Among the content that is request for the Ongoing Cx plan the following one is specified by the ID+C Reference guide: “Direction for testing new and retrofitted equipment”.