Design of flexibility - Can an open ceiling be counted as an accessible ceiling?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Michael   on 
Hi LEED experts, my interior Office wants to have an open ceiling, where people can see and access the piping, ductwork system, and HVAC machines hanging below the ceiling structure.
2
Associate, Built Ecology
WSP USA
LEEDuser Expert
6 thumbs up
Tue Sep 22, 2026, 2:54 pm
2
Principal
ME Engineers
LEEDuser Basic Member
30 thumbs up
Thu Apr 14, 2022, 7:04 pm

Option 2 :Only CO2 sensors

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Dina El-Sady  on 

The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional points .What should be done in other small spaces ?Can we only add CO2 se

3
Wed Apr 13, 2022, 2:12 pm

Is janitor closet water use considered as Process Water and need to be measured apart of domestic fixtures piping?

NC-v4 WEp3:Building-level water metering
posted by  Mauricio Toro  on 

We have been receiving comments from the LEED reviewer team asking for information to confirm that the non-fixture usage (e.g.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Sat Apr 9, 2022, 12:10 pm

Lighting control for hotel lobby, bar, restaurant

Hospitality-NC-v4 EQc6:Interior lighting
posted by  Giuseppina Amorusi  on 

Good morning

I have a question relating lighting control in a hotel building.