Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
10
Mon Jul 20, 2026, 9:57 am

Biomass Process Steam

NC-v4 EAc5:Renewable energy production
posted by  Keerthi Ratnayake  on 

Can steam produced from an on-site biomass boiler and used exclusively for manufacturing process loads be counted toward EA Credit: Renewable Energy Production in LEED v4 BD+C?

1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Jul 10, 2026, 9:05 pm

Option 3: Design for Flexibility, Plug-and-play lighting controls

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Crista Shopis  on 

I'm exploring this as a 3rd option for the Interiors Life-cycles credit but I have not found a example in these forums of this option being included in a successful submission.

0

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

4
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Fri Jul 10, 2026, 4:00 pm

Prevention through Design

NC-v4 INc1:Innovation
posted by  FUTING LI  on 

For projects located in China, can local national safety standards be used as an equivalent alternative to OSHA standards for this credit?

0

4 Buildings and 1 maintenance building excluded

NC-v4 EQc4:Indoor air quality assessment
posted by  Summer Gorder  on 

There are 4 biuldings being LEED certified, and one maintenance building. We did not include the maintenance building, but it is being questioned.

0

Shower & Changing room - does it require a sink and toilet?

NC-v4 LTc6:Bicycle facilities
posted by  Todd Bundren  on 

I am working on a student housing project on a university campus. The majority of the building are resident rooms with some amenity spaces.

1
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri Jun 12, 2026, 5:32 pm

AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?

CI-v4 EAc2:Optimize energy performance
posted by  Gera Feigon  on 

I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jun 11, 2026, 3:45 pm

Credit substitution with v4.1

NC-v4 LTc3:High priority site
posted by  Herman Calleja  on 

Could the 'High Priority Site' credit in LEED v4 be substituted with the LEED v4.1 credit 'High Priority Site and Equitable Development'?

Thank you 

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Aug 26, 2026, 5:56 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Jun 1, 2026, 6:26 pm