Forum quick links
Reuse of emergency water for toilet flushing?
NC-v4 WEc2:Indoor water use reductionposted by Erin Holdenried on
We have a laboratory project with emercency eye wash and shower stations that has a dedicated water supply. The water in the pipes serving these fixtures must be flushed on a regular basis.&n
Filtration Requirement for a Evaporative Cooling System
NC-v4 EQp1:Minimum indoor air quality performanceposted by Krithikha Muthukrishnan on
Hi,
Including racks in the assessment
NC-v4 MRc1:Building life-cycle impact reductionposted by Agnieszka Kaczmarek on
According to Option 4: can I include in the assessment metal racks in a warehouse?
Exterior Building Lighting façade - MANDATORY PROVISIONS ASHRAE 90.1 - 2010
NC-v4 EAp2:Minimum energy performanceposted by Sara BENAYYAD on
We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting.
Manufacturing waste for compliance
Warehouses-EBOM-v4 MRc4:Solid waste management - ongoingposted by FARIZAN DAVEZAC on
I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility.
Can lab surfaces be excluded?
CI-v4 EQc6:Interior lightingposted by Kristen Magnuson on
I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.
Performance period
EBOM-v4 EQc7:Green cleaning - products and materialsposted by DAVE LI on
Does the performance period of the provision only take three months or more?
Routine maintenance only- is a Facility Renovation Waste Management Plan necessary?
EBOM-v4 MRc5:Solid waste management - facility maintenance and renovationposted by Anna Kaelin on
My project diverted furniture during the performance period. The furniture is documented under this credit. Other than that, the project did not undergo any major renovations.
Definition of "Vegetated planters"
NC-v4 SSc5:Heat island reductionposted by Marion THIBAULT on
Dear all leed users,
Strucure and Enclosure Materials may not constitute more than 30% of the compliant building products
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Dave Hubka on
Reference Guide correction 100002183 allows this 30% to be adjusted based on the percent value of structure/enclosure materials compared to total material costs. Actual cost must be used.