Forum quick links
Government Required Irrigation - Exemption?
NC-v4 WEc1:Outdoor water use reductionposted by Sara Goenner Curlee on
One of my projects is being required to do some frontage improvement work along with the project itself.
Rainwater cleaned in a swales and drained into a nearby lake to preserve it
NC-v4 SSc4:Rainwater managementposted by Pooja Sannamani on
Our project consists of a building in a waste water treatment plan (WWTP) facility.
Project in a City-Provided Parking District
CI-v4 LTc5:Reduced parking footprintposted by Dane Andersen on
Hello,
Estimating Energy Use for a Laboratory
CI-v4 EAc6:Green power and carbon offsetsposted by Parker Hall on
My project pursued optimized energy performance option 2 - prescriptive compliance. An Energy model was not created for this building, so I intend to calculate out energy use via the U.S.
Baseline fan motor efficiency
NC-v4 EAp2:Minimum energy performanceposted by Simon Dellacher on
System fan power is calculated per ASHRAE 90.1-2010 Appendix G3.1.2.10, where for the systems 3 through 8 fan motor efficiency is part of the formula.
Koolshade as glare-control
NC-v4 EQc8:Quality viewsposted by Audrey LEDESERT on
We are working on a project that plans to put a Koolshade glare control (microlouver - https://www.smartlouvre.com/).
System without simultaneous Cooling and Heating
Hospitality-NC-v4 EQc5:Thermal comfortposted by Ricardo Sá on
Dear All,
MRp2/c5 -- Can we count shipping dunnage returned to precast manufacturer as material reuse?
NC-v4 MRp2:Construction and demolition waste management planningposted by Terry Thornsbury on
We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels.
CLASS 1 AIR SEPERATION DISTANCES_62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Fotis Kotsopoulos on
In case of a central AHU mounted on roof level supplying 100% (incl. run around coil) fresh air to office spaces:
Monitoring based Cx independent of Advanced Energy Metering?
NC-v4 EAc1:Enhanced commissioningposted by Joyce Kelly on
Our project is pursuing MBCx but the budget cannot support achievement of all rqmts of Advanced Energy Metering. Can we achieve one without the other?