Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Innovation by earning selected credits from other LEED rating system.

NC-v4 INc1:Innovation
posted by  Michael J Turner  on 

In the Innovation credit, the guide says "Points can also be earned by achieving selected credits from other LEED rating systems."

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Jun 3, 2020, 4:38 am

Default light reflectance values for commodity materials?

NC-v4 EQc6:Interior lighting
posted by  Joanna Switzer  on 

Curious if anyone has had success claiming some type of Industry cited / average / worst case LRV for surface finishes such as standard poured in place concrete flooring.

 

10
Sustainability Lead
PAE Consulting Engineers
LEEDuser Basic Member
5 thumbs up
Tue Jun 2, 2020, 12:40 pm

Full Occupancy Calculations

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Giovani Bernal  on 

Our project is a 24 level office building. At least 75% of occupancy has been reached.

1
Tue Jun 16, 2020, 7:15 pm
2
Mon Jun 1, 2020, 6:28 pm

PVC Welding Cement

NC-v4 EQc2:Low-emitting materials
posted by  Kerry Honsinger  on 

Anyone come up with a PVC Welding Cement that meets the CDPH Standard Method v1.1 -2010 emissions requirement?

5
Mon Jun 1, 2020, 6:14 pm

Short and Long Term Together?

NC-v4 LTc6:Bicycle facilities
posted by  Summer Minchew  on 

Can short and long term spaces be located together as long as all other requirements are met? 

1
Mon Jul 6, 2020, 2:29 pm

Bipolar Ionization devices; documenting reduced outside air quantities

Schools-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Kent B   on 

I have a new school project which currently has ionization devices throughout the HVAC RTUs.  These ionization devices reduce the required outside air.

0

IES thermal block and baseline model with system 6

NC-v4 EAc2:Optimize energy performance
posted by  Ying Lindsey  on 

Dear all, 
I need your professional opinion about a project that I am currently working on.

6
Thu May 28, 2020, 9:41 pm

Supervisor can hire Cxa?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Vanessa Montezuma Ramos  on 

We are participating in a Design-Build project of more than 20,000 ft2. Can the supervisor of the general contractor hire the Commissioning Agent?

1
Thu May 28, 2020, 5:28 pm

Process HVAC modeling approach

NC-v4 EAc2:Optimize energy performance
posted by  Pooja Sannamani  on 

Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit. 

1
Thu May 28, 2020, 12:58 pm