Baseline for Manufacturing facility energy usage...
NC-v4 EAc2:Optimize energy performanceposted by Rick Alfandre on
We are dealing with a manufacturing facility that has energy intensive process loads. Is there a standard way to establish a base case for manufacturing process loads?
International RPC available on USGBC site but ineligible when submitting credits
NC-v4 RPc1:Regional priorityposted by Tobi Langman on
Hello everyone,
pursuing Renewable Energy and Green Power with the v4.1 credit substitution path
NC-v4 EAc5:Renewable energy productionposted by Cindy Quinn on
I am working on a v4 project that is about to submit for final construction review. We must reach Gold and are right on the threshold, going in with 62 points, if all are earned. We don
Inherently Non-Emitting vs. Zero VOCs
NC-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
We have done 8 previous LEED 2009 Gold projects that were pursuing Redlist constraints on top of LEED.
Rooms with exterior access
Hospitality-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Dear All,
Item C Filtration under Option 1.
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Hannah Wong on
The requirement mentioned that ventialtion system that supplies outdoor air to occupied spaces must has particle filters or air-cleaning device that has filtration media meeting MERV 13 or higher.&
Baseline Building
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by VICTOR MORENO on
what ASHRAE Standard we use to create baseline building of one floor bungalow (hotel)?
Pilot Credit - Green Training
NC-v4 INc1:Innovationposted by Philippa Cameron on
Hi. Does anyone know if it is feasible to successfully meet the requirements for Pilot Credit 'Green Training for Contractors' on international projects?
Anti Termite at early stage
Healthcare-v4 SSp1:Construction activity pollution preventionposted by Mohsen Sayed on
Is there any LEED ruling for doing this activity at soil prior to pouring concrete in foundation level, There is no impact on underground water as the project located in desert &nbs
Exterior walk-off mats permitted?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Vince Briones on
Hi- has anyone gotten verification on whether exterior walk off mats are permitted under v4? The reference guide and current addenda are silent on that detail.